







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Fast, Reliable Kitchen Remodeling Across Irving
If you’re planning a kitchen remodel in Irving, you already know this city doesn’t fit one mold. South of the Airport Freeway, kitchens sit inside small brick ranches from the 1950s and 60s. North toward Las Colinas and Valley Ranch, they sit in townhomes and larger homes where finishes carry the room. We work both sides of that line, and we scope each one to what the house can actually support. Call (844) 320-6637 and we’ll set up a free estimate. We answer 24/7.
Why Irving Homeowners Call Construction Richardson for Kitchen Remodeling

Irving’s housing stock is split in a way that changes how a kitchen job runs. In the older core near the Heritage District and the old downtown, we’re regularly opening walls in post-war slab and pier-and-beam homes, which means field conditions come up once the drywall is off. In Las Colinas and Valley Ranch, the work is finish-driven: custom cabinetry, stone surfaces, architectural glass, and a client who has already chosen the look. We price and staff for both, because a contractor who only knows one half of Irving will guess wrong on the other half.
Our technicians have up to 12 years of experience across full remodels, cabinet and countertop installs, and layout changes. Because we run seven service categories under one contractor, from additions and ADUs to windows and doors, the structural questions a kitchen job raises don’t force you to find a second company. We can work with your insurer where it’s relevant, pull the permits, and hold the schedule to a written scope. Everything below is quoted as a line item, so nothing lands on you as a surprise.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Our Kitchen Remodeling Services in Irving
Full Kitchen Remodeling
A full remodel in Irving means tear-out, rough-in, layout changes, and finish work in sequence. On the south side that often includes addressing subfloor condition and older wiring once the walls are open; in Las Colinas it means protecting a high-end finish package during the rough phases. We build the whole scope in writing, with allowances for anything we can’t see until demo day.
Cabinets & Countertops
We work with cabinet lines like KraftMaid and Wellborn, and engineered stone from Cambria and Silestone. Cabinets drive the calendar on a high-end kitchen in Irving, so they get ordered to a finalized scope, not a hopeful one. Countertops are templated after the cabinets are set, which keeps the seams and overhangs where they belong.
Backsplash, Tile & Flooring
Tile and flooring are where Irving’s soils show up. Black clay movement can crack tile and shift an island if the subfloor and foundation aren’t checked before installation. We assess the floor structure first, then set tile and backsplash to a surface that’s actually stable.
Kitchen Design & Layout
Layout changes are the highest-value part of a remodel and the easiest to get wrong. Moving a range, sink, or island changes plumbing, electrical, and ventilation, and each one has a permit consequence. We design the layout around how the room is used and around what the house will allow, before any material is ordered.
Small & Partial Remodels and Island Installation
Not every Irving kitchen needs a full gut. A cabinet refacing, a new island, or a countertop swap can reset a room without touching the walls. Islands are the most requested single item, and they’re also where floor structure matters most.
Trusted Brands We Service in Irving
Material choice is where a kitchen gets its value, so we specify by name rather than by guesswork. KraftMaid and Wellborn cabinets, Cambria and Silestone quartz, and plumbing fixtures across Kohler, Grohe, Moen, Delta, and Toto sit in the portfolio, and each has a different lead time that goes into the schedule. We don’t stock parts or hold inventory, so what you get is ordered to your specification, not pulled off a shelf. That’s also why lead times, not labor, set the calendar on a high-end kitchen in Irving. Our kitchen remodeling team builds the order date into the written schedule up front.
Common Kitchen Remodeling Problems We See in Irving Homes
- Cabinet and glass orders released before the scope is fixed. When allowances aren’t written down, field conditions turn into change orders and the cabinet order gets re-cut. Finalize the written scope first, then order.
- Lead times underestimated on designer finishes. Cambria quartz and architectural glass can stretch a Las Colinas kitchen schedule if they’re ordered late, and the compression shows up as rushed rough-in work.
- Black clay movement cracking tile and shifting islands. Irving’s soils shrink and swell through hot, dry summers and wet springs. If the subfloor and foundation aren’t assessed during the remodel, the new tile pays for it.
- Unopened walls hiding old work. In the 1950s and 60s south Irving ranches, subfloor deterioration and outdated wiring are common once the kitchen is opened. A scope with allowances absorbs this; a fixed bid without one doesn’t.
Pricing for Kitchen Remodeling in Irving, TX

Here’s the honest picture on cost. A full kitchen remodel in Irving typically runs $14,000 – $45,000, and a small or partial remodel runs $9,000 – $20,000. Those ranges hold because they’re built from line items, and the written estimate sets the final price. What moves you within a range is cabinet line, stone selection, layout changes, and how much the opened walls reveal.
| Service | Typical Estimated Range |
|---|---|
| Kitchen Remodel | $14,000 – $45,000 |
| Small Kitchen Remodel | $9,000 – $20,000 |
| Cabinet Installation | $4,000 – $13,000 |
| Countertop Installation | $2,000 – $6,500 |
| Backsplash Installation | $800 – $2,500 |
| Kitchen Island Installation | $3,000 – $10,000 |
Estimates are free, and they’re written as line items with allowances, so the number holds once ordering starts.
See the difference
Before
After
Before
After
Before
AfterHow Irving’s Two Markets Shape a Kitchen Schedule
In Irving, kitchen remodeling schedules are set by the lead times of custom cabinetry and imported finishes, not by labor availability. That’s a direct result of the city’s split-market dynamics. From 1950s south Irving tear-outs to Las Colinas high-end renovations, suppliers prioritize large commercial orders and high-end residential clients who plan months ahead. If your kitchen order isn’t planned and placed early, you’re in line behind someone who did.
Here’s how a typical Irving kitchen remodel usually goes. Homeowners in older south Irving homes often face unexpected subfloor deterioration and outdated wiring once walls are opened, while Las Colinas clients contend with custom millwork deliveries that can take 12 to 16 weeks. A qualified local general contractor will first establish a written scope of work with allowances, then schedule trades around the long-lead cabinet order, and use a draw schedule to manage cash flow, so permits and inspection sign-off are sequenced before the punch list.
Black clay soil is the other recurring factor. The DFW-area clay shrinks and swells through Irving’s hot, dry summers and wet springs, which is why foundation and drainage corrections are routine here rather than occasional. In a kitchen, that means the foundation and subfloor get assessed before tile and islands go in, not after. South Irving’s mature pecan and oak canopy adds a smaller wrinkle: tight lot access on some blocks means material deliveries need coordination, and infill builds on the same streets have to work around root zones and alley-fed utility easements.
We Also Serve Cities Near Irving
We work throughout the Irving area and into neighboring cities, including Farmers Branch, Coppell, University Park, and Addison. If your kitchen is just outside Irving’s line, the same scope, permit, and schedule discipline applies. Call to confirm your address and we’ll set the estimate.
Serving Irving, TX – Our Local Coverage Area
We serve Irving and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
FAQs – Kitchen Remodeling in Irving
Irving’s black clay soils shrink and swell through the seasons, and in older south Irving homes that movement can crack tile and shift an island. We assess the subfloor and foundation before tile or island installation, so the new work sits on a stable surface. Call (844) 320-6637 to schedule a free estimate.
Most kitchen remodels that move plumbing, electrical, or structural elements require a permit from the City of Irving, and we handle the permitting and inspections as part of the job. The exact requirement depends on your scope, so the written estimate names what will be pulled. Call (844) 320-6637 for an exact quote.
Custom millwork deliveries for Las Colinas kitchen projects can take 12 to 16 weeks, which is why cabinets set the schedule on that tier. Labor usually isn’t the constraint; the order date is. Call (844) 320-6637 to build the lead time into your written schedule.
A draw schedule releases project payments in stages tied to completed work, which keeps cash flow aligned with progress rather than front-loaded. On a lead-time-driven Irving kitchen, it lets you commit to the cabinet order early without paying the whole job up front. Call (844) 320-6637 and we’ll walk through the draw schedule with your estimate.
Yes, a kitchen can be phased, typically starting with cabinets and countertops and following with backsplash, island, and flooring. Phasing works best when the layout is designed once, in writing, so each phase fits the next. Call (844) 320-6637 for a free estimate on a phased scope.
Get Your Irving Kitchen Estimate

Whether your kitchen is in a 1950s south Irving ranch or a Las Colinas townhome, the first step is the same: a written scope with allowances, so lead times and price are fixed before anything is ordered. We pull the permits, hold the schedule to the spec, and hold the price to the written estimate. Call (844) 320-6637 for a free estimate. We answer 24/7. Fast dispatch from 7am to 7pm, Sunday through Friday.
Written by the team at Construction Richardson.












